Rocky Mountain Research Station Flagstaff Lab Managing Arid and Semi-Arid Watersheds
Home About this site About the Arizona Watershed Program Central Arizona Highlands Bibliography of literature from the Arizona Watershed Progam Flagstaff Lab images from the Arizona Watershed Program Research data
Basics of watersheds Information for teachers and students Related links Feedback
University of Arizona

Site Administration and Facilities

Primary and ultimate responsibility and authority for administering the Beaver Creek Experimental Watershed on this federal property was, by law, the Chief of the USDA Forest Service who in turn delegates authority to the Director of the Rocky Mountain Forest and Range Experiment Station (RMFRES), now the Rocky Mountain Research Station.

Because this land was (prior to the establishment of the BCEW) and still is part of the Coconino National Forest (administered by the Forest Supervisor, District Rangers, and Regional Forester), certain responsibilities such as administering timber sales, construction and maintenance of roads, and fire protection were retained by the Coconino National Forest. National forest personnel installed the many measuring structures and devices required, carried out the land treatment prescriptions, and performed protection and management functions. Close cooperation between administrative and research activities was required at all times.

Acknowledging the above responsibilities, the Forest Service shared in the management of long-term watershed management research at Beaver Creek with research institutions, recognizing the need for all parties to commit funds, personnel, and equipment to attain common long-term objectives in research and education.

Principal investigators representing the USDA Forest Service, Colorado State University, Northern Arizona University, University of Arizona, Arizona Game and Fish Department, and the USDI Geological Survey were involved. The Geological Survey installed and read certain stream gages, the Arizona Game and Fish Department evaluated the effect of treatments on wildlife and habitat, and research by universities complimented the efforts of the RMFRES. In addition, the advice and support of other interests groups, including the Salt River Project, the Soil Conservation Districts, cattlegrowers, lumbermen, and others was available. These groups and agencies were responsible for the planning, direction and management of the research programs at the BCEW. General supervision of the BCEW was under the Forest Service principal investigator, the Project Leader, as delegated by the Director of the Rocky Mountain Forest and Range Experiment Station.

One of the most important interest group was the Arizona Water Resources Committee (AWRC), a committee that included civic minded, thoughtful representatives of practically every group interested in public land management. This group worked closely with the Supervisor of the Coconino National Forest, the Regional Forester of Forest Service Region 3, and the Director of the RMFRES in an advisory and supporting capacity. The AWRC also played an important role in obtaining funding for much of the work accomplished by the Beaver Creek Project.

Selected Reference

Fox, K. M., Ffolliott, P. F., Baker, Jr., M. B. and Debano, L. F. 2000. More water for Arizona: A history of the Arizona Watershed Program and the Arizona Water Resource Committee.

Site Facilities

The Beaver Creek Experimental Watershed consists of a 111,375 ha (275,000 ac) watershed in the Coconino National Forest that was established in 1956. There are numerous cindered roads within the watershed, which are maintained by the Coconino National Forest. Snow was normally removed from these roads during the active stage of the project, but currently winter access is restricted to the 10 miles of paved road off of I-17 at the Stoneman Lake interchange.

Prior to termination of the project in 1983, access to major research installations such as five weather stations (air temperature, humidity, and precipitation) , over 60 precipitation stations, and 40 gaged watersheds was by both cindered and non-cindered roads which were generally passable all year long (see maps). This road system along with the numerous logging roads within the watershed made the area very attractive to campers, hikers, and hunters. Generally, the precipitation stations were located at the lower and upper elevations in the experimental watersheds and have a density of about one station per ha.

(Pictures of weather station, precipitation gage, stream flow gage, and roads)

The USDA Forest Service operated a year-round office/shop building on the Beaver Creek Experimental Watershed. A trailer provided living quarters for a technician who worked 10 days on and 4 days off. This provided at least one person on the watershed during the week and for most weekends. At least three other technicians lived within commuting distance of the watershed and were able to get to it within an hour of traveling time. Most gages were visited at a minimum of once a week and more often during the active runoff period, which could occur almost anytime during the winter season (October through April).


Home | Highlands Page | Beaver Creek Page
14 March 2001
credits