MAINTENANCE
SCHEDULE FOR TALL FESCUE AND PERENNIAL RYEGRASS
HIGH ELEVATION
(FLAGSTAFF, SHOW LOW, ST. JOHNS, PRESCOTT)
| |
MONTH |
|
| ACTIVITY |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
REMARKS |
| Seeding |
|
|
|
|
|
|
|
X |
|
|
|
|
August 15 - 30,
July 15 - August 10, Flagstaff |
| Sodding |
|
|
|
X |
|
|
|
|
X |
X |
|
|
Rarely
established by sod. Occasionally TF available as a netted sod.
Fall is preferred time. |
| Fertilizing |
|
|
|
X |
X |
|
|
|
X |
X |
|
|
September and
October = 1.0 lb. -N- per 1000 ft2
April and May = 1/2 lb. -N- per 1000 ft 2 |
| Dethatch/Aerify |
|
|
|
|
O |
X
O |
|
|
X
O |
|
|
|
Rarely needs
dethatching.
X = Dethatch, follow with reseeding.
O = Aerification, September preferred. April or
May. |
| Pre-emergent weed control |
|
|
|
X |
|
|
|
|
X |
|
|
|
April = summer
annual weed control.
September = winter annual weed control. |
Water
(inches per week) |
|
|
1/4 |
3/8 |
3/8
to
1/2 |
3/4
to
1-1/4 |
1
to
1 1/2 |
1
to
1 1/2 |
1
to
1 1/4 |
3/4
to
1 |
3/8 |
|
Flagstaff |
| |
|
3/8 |
1/2 |
1/2
to
3/4 |
1 1/4
to
1 1/2 |
1 1/4
to
1 1/2 |
1 1/4
to
1 1/2 |
1
to
1 1/4 |
3/4
to
1 |
3/8
to
1/2 |
|
Other |
|
|