Walker Basin Allotment Home

 

Walker Basin Allotment (S&W) Interim Managenent Plan Amendment #1

Long Valley Ranger District
Beaver Creek Ranger District
Coconino National Forest

Submitted By: Sam Wolfskill, Long Valley District Ranger, Date: 12-10-86
and Jim Howard, Beaver Creek District Ranger, Date: 12-8-86

Agreed To By: Ben Zink, Permittee Date: 1-9-87
Approved By: (unreadable signature), Forest Supervisor Date: 5-26-87

I. Introduction.

The current Walker Basin Interim Management Plan was approved in 1985. This amendment will add a proposed range improvement and will be made a part of the Term Grazing Permit under Part 1, Item 4, and Part 2, Item 6 as issued to Ben Zink on 10/3/85.

II. Range Development Program.

This amendment proposes to locate a ranch foreman's winter headquarters at the Shipping Pens (Range Improvement #1222) located in Section 10, T14N, R6E. This will include one mobil home, the installion of a septic system, drilling a water well, and gravelling the access road to the facìlities.

III. Revision.

This amendment will be made a part of the approved interim management plan and will not change the management goals of the plan.

Proposed Location


V Bar V Ranch | Walker Basin Allotment | Management Records | Allotment Management Plans

Last Revised: 26 August 2001